Job board › IT and software jobs
ACMV Engineer x4 (Data Centre/Construction/MNC)
Talent Trader Group · Johor Bahru, Malaysia · On-site · Posted 4 days ago
Get 3 free interview questions and apply →Apply on the employer's site ↗
About the job
Key Responsibilities:
• Design and implement ACMV systems for data centres.
• Conduct load calculations and optimize cooling efficiency.
• Oversee installation, testing, and commissioning.
• Monitor performance, troubleshoot issues, and ensure compliance.
• Prepare technical reports and risk assessments.
• Ensure safety, quality control, and regulatory compliance.
• Support maintenance and post-handover operations.
Requirements
• Degree in Mechanical or Building Services Engineering.
• At least 2 years working experience in ACMV/HVAC engineering.
• Experience in CRAC/CRAH, chilled water, DX cooling, and airflow management.
• Strong problem-solving and project management skills.
Interested candidates who wish to apply for the advertised position, please click 'APPLY' to submit your application or send in your resume to engg1@talenttradersg.com
EA License No: 13C6305
Reg. No.: R1874608
For candidate who applied for the advertised position is deemed to have consented to us that we may collect, use or disclose your personal information for purpose in connection with the services provided by us.
Applying is free. Dyalo never charges you to apply. Always check a job on the employer's own site.